SuperKEKB Shift Report

2021/6/10 (Th) Day shift

KCG shift Shift leader KEKB MSC Linac shift Linac MSC BCG
K.EGAWA K.YOSHINO M.MINEGISHI
T.SHIRAISHI
H.NOGUCHI
Y.OKAYASU T.ICHIKAWA
T.KUDO
---

Shift Summary

recorded delivered
Peak luminosity .03 x 10 34 cm-2s-1
Integrated luminosity (shift) .0 pb-1 .0 pb-1

LER HERBoth DR
Energy 4.000 GeV 7.007 GeV 10.579 GeV 1.1 GeV
Beam current 250.6 mA 50.1 mA 6.4 mA
No. bunches 1174 1174
Beta at IP 80 mm / 1 mm
80 mm / 2 mm
100 mm / 3 mm
200 mm / 8 mm
60 mm / 1 mm
Crab Waist Ratio 80 % 40 %
Aborts 17 1 6

IP Knob Tuning

11:04 LER HER
r1 (mrad) 0.00 0.00
r2 (mm) 0.00 0.00
r3 (1/hm) 0.00 0.00
r4 (crad) 0.00 0.00
ηy (mm) 0.00 0.00
ηpy (mrad) 0.00 0.00
waist (mm) 2.14 0.30
chromatic r1 (mrad) 0.00 0.00
chromatic r2 (mm) 0.00 0.00
chromatic r3 (1/m) 0.00 0.00
chromatic r4 (rad) 0.00 0.00
created on 11/11/2021 02:03:58