SuperKEKB Shift Report

2024/5/3 (Fr) Day shift

KCG shift Shift leader KEKB MSC Linac shift Linac MSC BCG
H.KOISO Y.OHSAWA MI.TANAKA
Y.KURODA
F.MIYAHARA T.HIRANO
S.USHIMOTO
Varsha Gautam

Shift Summary

recorded delivered
Peak luminosity 2.51 x 10 34 cm-2s-1
Integrated luminosity (shift) 110.1 pb-1 118.0 pb-1

LER HERBoth DR
Energy 3.979 GeV 6.970 GeV 10.523 GeV 1.1 GeV
Beam current 1001.8 mA 800.6 mA 16.4 mA
No. bunches 2346 2346
Beta at IP 80 mm / 1 mm 60 mm / 1 mm
Crab Waist Ratio 80 % 40 %
Aborts 0 0 0

IP Knob Tuning

09:17 LER HER
r1 (mrad) -5.00 -8.60
r2 (mm) -4.19 2.25
r3 (1/hm) 0.00 0.00
r4 (crad) 0.00 0.00
ηy (mm) -0.19 -0.23
ηpy (mrad) 0.00 -10.00
waist (mm) 1.65 -1.30
chromatic r1 (mrad) 0.00 0.00
chromatic r2 (mm) 0.00 0.00
chromatic r3 (1/m) 0.00 0.00
chromatic r4 (rad) 0.00 0.00
created on 05/03/2024 09:20:07