KEKB Linac/Ring Commissioning Group


News Flash! (very old, sorry)

News (old again)

KCG Shift Reports (?)

Simultaneous Injection Project

High-current Low-emittance RF-gun Project

High-current Positron Generation Project

Pulsed Magnet Project

New Low-level RF Project

Two-bunch Acceleration Project

C-Band High-gradient Project

Continuous Injection Project

Linac Orbit Display Archives:

Recent Orbit Displays KEKB e+,   KEKB e+ 2-bunches,   KEKB e-,   PF e-,   PFAR e-

KEKB Screen Shots of Operation Panels

KEKB Injection History

KEKB One-day Operation Summary

KEKB 2-Hour Operation Summary

KEKB 3-Hour Operation Summary for Docomo i-Mode or J-Phone J-Sky

KEKB Bunch-by-bunch Luminosity [View1] [View2] [Original bucket view] [Original time view]

Linac and BT Wire Scanner Log

B and C sectors:   1st e- bunch,   2nd e- bunch,   1st e+ bunch,   2nd e+ bunch
5 sector and BT:   1st e- bunch,   2nd e- bunch,   1st e+ bunch,   2nd e+ bunch

KEKB Ring Utility Info

KEKB Ring Cooling Water Temperature,   KEKB Ring Tunnel Temperature

KEKB Linac/Ring Commissioning Mail Archive

LCG Daily News are acumulated in Linac (1997-2000) and Linac-Update (2000-) Mail Archives

Members and e-Mail lists

Commissioning Report 1997 (34 Pages)

Other Reports of Commissioning, and Other Reports of Linac

PTEP (Progress of Theoretical and Experimental Physics) issue for KEKB Accelerator in 2013

NIM A (Nuclear Insttruments and Methods in Physics Research) issue for KEKB Accelerator in 2003


[Please Comment on This Page]   <webmaster@mail-linac.kek.jp>, Apr.12.1997 - Sep.26.2021.
[Linac Operation Log]   [KEKB Operation Log]   [Copy]  [Operation Excerpt]  [KCG ShiftReport]
[Linac-Com]  [Linac]   [KEKB 1]  [KEKB 2]  [KEKB Int.]  [Accelerator]   [Accel-J]  [Belle]   [KEK]