BPAC Linac and Recent Ring Reports
Belle Program Advisory Committee (BPAC) Meeting Reports related to the Injector Linac and Ring
[Links]
[Bottom]
- Summer 2025 BPAC, Jun.30-Jul.01.2025.
- Spring 2025 BPAC, Mar.03-05.2025.
- Autumn 2024 BPAC, Sep.24-25.2024.
- K.Shibata, SuperKEKB Status,
bpac-status-shibata-240924.pdf
- K.Uno, SuperKEKB Status,
bpac-sbl-uno-240924.pdf
- 18th Annual BPAC, Feb.5-7.2024,
- M.Masuzawa, M.Tobiyama, SuperKEKB Ring Status,
bpac-ring-masuzawa-240205.pdf
- H.Ego, Upgrade Status of the Injector LINAC,
bpac-linac-ego-240205.pdf
- M.Masuzawa, SKB Limitations and Upgrade Path,
bpac-limit-upgrade-masuzawa-240205.pdf
- Autumn 2023 BPAC, Nov.13-14.2023,
- Y.Ohnishi, Commissioning Plan in Run 2,
bpac-comm-ohnishi-231113.pdf
- Summer 2023 BPAC, Jun.26-28.2023,
- K.Shibata, Status of Accelerator Upgrades during LS1,
bpac-ls1-shibata-v2-230626.pdf
- 17th Annual BPAC, Feb.19-21.2023,
- H.Ego, SuperKEKB LS1 upgrade status (including injector),
bpac-ls1-ego-230219.pdf
- M.Masuzawa, SuperKEKB LS2 upgrade plans (including injector),
bpac-ls2-masuzawa-230219.pdf
- Autumn 2022 BPAC, Oct.31-Nov.2.2022,
- M.Tobiyama, Status of SuperKEKB Accelerators,
bpac-ring-tobiyama-221031.pdf
- M.Tobiyama, Appendix: Non-linear collimator,
bpac-ring-nlc-tobiyama-221031.pdf
- H.Ikeda, Beam Abort Diagnosis,
bpac-ring-abort-ikeda-221031.pdf
- Summer 2022 BPAC, Jun.27-29.2022,
- M.Masuzawa, SuperKEKB status,
bpac-ring-masuzawa-220627.pdf
- 16th annual BPAC, Feb.21-Mar.02.2022,
- M.Tobiyama, Main Ring operation status and plan,
bpac-ring-tobiyama-220221.pdf,
bpac-ring-tobiyama-response-220221.pdf
- K.Furukawa, Injector LINAC, DR, BT status and plan,
bpac-linac-furukawa-220221.pdf,
bpac-linac-furukawa-220221.pptx
- K.Shibata, Machine upgrade plans,
bpac-ringupgrade-shibata-220222.pdf
- Autumn 2021 BPAC, Nov.8-10.2021,
- Y.Suetsugu, ARC report, Accelerator operation (MR),
bpac-ring-suetsugu-211109.pdf
- K.Furukawa, Accelerator operation (Injector; LINAC, DR, BT),
bpac-linac-furukawa-211109.pdf
- Summer 2021 BPAC, Jul.12-13.2021,
- Y.Ohnishi, SuperKEKB overview,
bpac-ring-ohnishi-210712.pdf
- 15th annual BPAC, Feb.15-Mar.3.2021,
- Y.Suetsugu, SuperKEKB overview, near-term plan and long-term strategy,
bpac-ring-suetsugu-210222.pdf,
SKEKB_Overview_Near_Long_term_Suetsugu.mp4
- N.Iida, Beam injection(Injector, DR, BT, injection background mitigation),
bpac-linac-iida-210222.pdf
- T.Ishibashi, Collimators and transverse mode coupling instability,
bpac-collimator-ishibashi-210222.pdf
- M.Tobiyama, SuperKEKB plans,
bpac-plan-tobiyama-210225.pdf
- November 2020 BPAC, Nov.19.2020,
- K.Furukawa, Injector linac status,
bpac-linac-furukawa-201119.pdf,
bpac-linac-furukawa-201119.pptx
- 14th annual BPAC, Feb.10.2020,
- M.Satoh, Injector challenges,
bpac-linac-msatoh-200210.pdf,
bpac-linac-msatoh-200210.pptx
- 13th annual BPAC, Feb.11.2019,
- K.Furukawa, Electron/Positron Injector Phase-2 Status and Phase-3 Plan,
bpac-linac-furukawa-feb2019.pdf,
bpac-linac-furukawa-feb2019.pptx
- October 2018 BPAC, Oct.22.2018,
- K.Furukawa, Electron/Positron Injector Phase-2 Status and Phase-3 Plan,
bpac-linac-furukawa-oct2018.pdf,
bpac-linac-furukawa-oct2018.pptx
- 7th annual BPAC, Mar.11.2013,
- K.Furukawa, Electron / Positron Injector Linac Status,
bpac-linac-furukawa6-mar2013.pdf,
bpac-linac-furukawa6-mar2013.pptx
- BPAC Indico page
- B2GM (Belle II General Meeting) Accelerator Reports
- B Factory Advisary Board Linac Reports (in Japanese)
- ARC/MAC (KEKB Accelerator Review Committee)
- Linac Projects
- Linac Reports
- Linac Conference Reports
[Top]
Kazuro Furukawa <webmaster@mail-linac.kek.jp>, Hiroyasu Ego,
KEK, Apr.09.2018 - Oct.07.2024.
[ Linac report ]
[ Linac paper ]
[ Linac ]
[ SuperKEKB ]
[ Belle II ]
[ KEK ]