Submitted Abstracts


Total_records: 71    
How We Do Business
Andreas Stolz Operations of the Coupled Cyclotron Facility at Michigan State University
Hiroyuki Hama Electron Accelerator Complex at Tohoku University, 42-Year-Operation and Future
Pramod Bhagwat Pelletron Accelerator Facility - Operational experience of two decades
yorita Operation of cyclotrons at RCNP
Xiaofeng Shen Machine Operation and Maintenance in CLS
Aiken Experiment Liaison Duties
Hiroshi lzumiya The improvement of HIMAC-INJECTOR operation
Manabu Tanaka Luminosity Tuning and Operation Statistics at KEKB
Masahiro Kawashima Current state of HIMAC accelerator
Hyeok-Jung Kwon Operation Status of the PEFP Proton Accelerator*

Commissioning
qinq Commissioning of the BEPC-II Storage Rings
Chen Guanghui Injector Linac Upgrade and Operation for the BEPC¢ò Project
zhangwenzhi Commissioning and Operation of SSRF
mwstanek Commissioning Experience for SLAC Linac Coherent Light Source
isaac.gertz Status of the Soreq Applied Research Accelerator Facility
Masayuki Kase Operation of RIKEN RI Beam Factory
Jiancheng Yang The operation status of HIRFL and commmssioning of HIRFL-CSR
newhart Accelerator Operations involvement in project development.
Michael Galonska Commissioning of the carbon beam gantry at the Heidelberg Ion Therapy (HIT) accelerator
malbert LHC commissioning
Kazuro Furukawa Commissioning of J-PARC main ring
malbert Preparation for beam commissioning at the LHC
malbert Facilities and utilities for driving the LHC

Automation & Tools
Schuett The GSI Operation Logbook OLog
Karnaev Automation of the Experiment on the VEPP-4 Facility
Kazuro Furukawa Pulse-to-pulse Beam Modulation for KEKB and PF Injections and Energy Management at KEK 8-GeV Linac
Wolfgang Bayer An Operators Tool for Schottky Analysis
Eun-Mi An User Interface Design for PEFP Accelerator Operations
Charles Peters SNS Operations Tools and Automation
JTrewhella An Automated Injection System for ¡°Fill on Fill¡± Operation
eung-Soo Park The PLS Operation and the Tools

Ergonomics & Control Room
Young-Gi Song Current Status and Future Prospect of the PEFP Control Room*
Peter Schuh SLAC Main Control Center upgrade
Andrea Apollonio The Control Room FERMI
bieler New furniture for the DESY accelerator control room

Training
Bruce Worthel Training New Operators – The First Six Months
Jim Morel Non-Linear Opportunity Based Training Methods at a Small Facility.
Tadashi Fujinawa Training syllabus for RIKEN NISHINA Center
Paul Vasilauskis Utilizing Open Source Software to Manage Training
Angelic Pearson Operator Training Program at ALS: Recent Improvements
knunez Managing Procedural Training

Maintenance
sampson Transition from Shutdown to Operations
takashi.sugimoto Reassignment of network addresses at SPring-8 control system
Stefano Krecic Water cooling maintenance and improvement.
Carlucci Maintenance activities at Laboratori Nazionali di Legnaro
Rene Tanaja Maintenance Coordination at TRIUMF's Cyclotron and ISAC Facilities
Gye po Jeon HVAC concept design for Proton target room operation
Kyeong-Jun Mun Electric Power System Design of PEFP to Ensure Reliability in Operation
K.shimabukuro HIMAC irradiation system operation, maintenance and troubleshooting
daeil kim Maintenance Strategy of the PEFP Proton Linear Accelerator
Yeun-Soo Park Improvement of MC-50 Cyclotron Tuning Module through Development of Software Program for Cyclotron Control Console System
Jim Morel High Risk Maintenance Project at the LBNL 88-Inch Cyclotron

Safety & Regulation
ingrassia User Controlled Access at NSRL
saji Construction of the New Accelerator Safety Interlock System for SPring-8
okay Continuity of Accelerator Operations during an Extended Pandemic
bieler DESY Access Control System
mmurphy Implementation of Electrical Safety Procedures and Techniques for Accelerator Operations
Cheol Woo LEE Estimations of the Induced Activities in the Proton Accelerator Facilty of PEFP

Reliability
donmcgil Reliably Cooling Accelerators
Mun Gyung Kim Beam Energy Reliability by the Cooling Water temperature of the PLS
whong Preliminary measurement of Be-10 isotope by 1 MV AMS

Other Subject
LEE HWA RYUN Operation scenario of the vacuum system in PEFP accelerator and beamline
hamano DEVELOPMENT OF HIGH RESOLUTION LARGE DISPLAY FOR SPRING-8 CENTRAL CONTROL ROOM
Sang-Hee Kim Test of the Modulator System with Inverter Power Supply for 3.0 GeV Linac
jcyun Control Status of the PLS MPS Control System
Yoon, Sang-pil The operation scenario of beam lines and target room in the PEFP acelerator facility
Yasuhide Ishizawa Study of an Electrical Noise from Synchrotron Radiation
Sung-chul YANG The Monte Carlo Simulation for a Measurement of a Neutron Cross Section in the Pohang Neutron Facility

Invited

S.B.Lee Control System for the Clinical Operation in Proton Therapy Center
I.C.Lim Experience from HANARO Reactor Management
M.K.Park Operational Results and Experience of KSTAR Intergated Control System