Submitted Abstracts
Total_records: 71 |
How We Do Business |
Andreas Stolz | Operations of the Coupled Cyclotron Facility at Michigan State University |
Hiroyuki Hama | Electron Accelerator Complex at Tohoku University, 42-Year-Operation and Future |
Pramod Bhagwat | Pelletron Accelerator Facility - Operational experience of two decades |
yorita | Operation of cyclotrons at RCNP |
Xiaofeng Shen | Machine Operation and Maintenance in CLS |
Aiken | Experiment Liaison Duties |
Hiroshi lzumiya | The improvement of HIMAC-INJECTOR operation |
Manabu Tanaka | Luminosity Tuning and Operation Statistics at KEKB |
Masahiro Kawashima | Current state of HIMAC accelerator |
Hyeok-Jung Kwon | Operation Status of the PEFP Proton Accelerator* |
Commissioning |
qinq | Commissioning of the BEPC-II Storage Rings |
Chen Guanghui | Injector Linac Upgrade and Operation for the BEPC¢ò Project |
zhangwenzhi | Commissioning and Operation of SSRF |
mwstanek | Commissioning Experience for SLAC Linac Coherent Light Source |
isaac.gertz | Status of the Soreq Applied Research Accelerator Facility |
Masayuki Kase | Operation of RIKEN RI Beam Factory |
Jiancheng Yang | The operation status of HIRFL and commmssioning of HIRFL-CSR |
newhart | Accelerator Operations involvement in project development. |
Michael Galonska | Commissioning of the carbon beam gantry at the Heidelberg Ion Therapy (HIT) accelerator |
malbert | LHC commissioning |
Kazuro Furukawa | Commissioning of J-PARC main ring |
malbert | Preparation for beam commissioning at the LHC |
malbert | Facilities and utilities for driving the LHC |
Automation & Tools |
Schuett | The GSI Operation Logbook OLog |
Karnaev | Automation of the Experiment on the VEPP-4 Facility |
Kazuro Furukawa | Pulse-to-pulse Beam Modulation for KEKB and PF Injections and Energy Management at KEK 8-GeV Linac |
Wolfgang Bayer | An Operators Tool for Schottky Analysis |
Eun-Mi An | User Interface Design for PEFP Accelerator Operations |
Charles Peters | SNS Operations Tools and Automation |
JTrewhella | An Automated Injection System for ¡°Fill on Fill¡± Operation |
eung-Soo Park | The PLS Operation and the Tools |
Ergonomics & Control Room |
Young-Gi Song | Current Status and Future Prospect of the PEFP Control Room* |
Peter Schuh | SLAC Main Control Center upgrade |
Andrea Apollonio | The Control Room FERMI |
bieler | New furniture for the DESY accelerator control room |
Training |
Bruce Worthel | Training New Operators – The First Six Months |
Jim Morel | Non-Linear Opportunity Based Training Methods at a Small Facility. |
Tadashi Fujinawa | Training syllabus for RIKEN NISHINA Center |
Paul Vasilauskis | Utilizing Open Source Software to Manage Training |
Angelic Pearson | Operator Training Program at ALS: Recent Improvements |
knunez | Managing Procedural Training |
Maintenance |
Safety & Regulation |
Reliability |
donmcgil | Reliably Cooling Accelerators |
Mun Gyung Kim | Beam Energy Reliability by the Cooling Water temperature of the PLS |
whong | Preliminary measurement of Be-10 isotope by 1 MV AMS |
Other Subject |
Invited |
S.B.Lee | Control System for the Clinical Operation in Proton Therapy Center |
I.C.Lim | Experience from HANARO Reactor Management |
M.K.Park | Operational Results and Experience of KSTAR Intergated Control System |