SuperKEKB Shift Report

2021/10/29 (Fr) Day shift

KCG shift Shift leader KEKB MSC Linac shift Linac MSC BCG
Y.FUNAKOSHI K.MORI T.ISHIHARA
M.FUJITA
A.SHIRAKAWA S.KUSANO
T.KUDO
Makoto Takizawa

Shift Summary

recorded delivered
Peak luminosity .00 x 10 34 cm-2s-1
Integrated luminosity (shift) .0 pb-1 .0 pb-1

LER HERBoth DR
Energy 4.000 GeV 7.007 GeV 10.579 GeV 1.1 GeV
Beam current 101.0 mA .0 mA 7.6 mA
No. bunches 1565 1565
Beta at IP 80 mm / 1 mm
80 mm / 2 mm
60 mm / 1 mm
Crab Waist Ratio 80 % 40 %
Aborts 6 0 115

IP Knob Tuning

15:59 LER HER
r1 (mrad) 0.00 0.00
r2 (mm) 0.00 0.00
r3 (1/hm) 0.00 0.00
r4 (crad) 0.00 0.00
ηy (mm) 0.00 0.00
ηpy (mrad) 0.00 0.00
waist (mm) 2.14 0.50
chromatic r1 (mrad) 0.00 0.00
chromatic r2 (mm) 0.00 0.00
chromatic r3 (1/m) 0.00 0.00
chromatic r4 (rad) 0.00 0.00
created on 10/29/2021 16:01:02