SuperKEKB Shift Report

2021/10/31 (Su) Day shift

KCG shift Shift leader KEKB MSC Linac shift Linac MSC BCG
D.ZHOU K.NAKANISHI H.TSUKAHARA
M.FUJITA
M.YOSHIDA S.KUSANO
K.SUZUKI
Makoto Takizawa

Shift Summary

recorded delivered
Peak luminosity .00 x 10 34 cm-2s-1
Integrated luminosity (shift) .0 pb-1 .0 pb-1

LER HERBoth DR
Energy 4.000 GeV 7.007 GeV 10.579 GeV 1.1 GeV
Beam current 200.7 mA 200.3 mA 7.5 mA
No. bunches 783 783
Beta at IP 80 mm / 1 mm 60 mm / 1 mm
Crab Waist Ratio 80 % 40 %
Aborts 0 0 0

IP Knob Tuning

15:59 LER HER
r1 (mrad) 0.00 3.00
r2 (mm) 0.00 -1.65
r3 (1/hm) 0.00 0.00
r4 (crad) 0.00 0.00
ηy (mm) 0.00 0.00
ηpy (mrad) 0.00 0.00
waist (mm) 2.14 0.50
chromatic r1 (mrad) 0.00 0.00
chromatic r2 (mm) 0.00 0.00
chromatic r3 (1/m) 0.00 0.00
chromatic r4 (rad) 0.00 0.00
created on 10/31/2021 16:01:02