SuperKEKB Shift Report

2024/11/7 (Th) Day shift

KCG shift Shift leader KEKB MSC Linac shift Linac MSC BCG
N.IIDA M.FURUSAWA M.MINEGISHI
K.YOSHII
N.IIDA M.CHIKU
K.SUZUKI
Vikas RajG

Shift Summary

recorded delivered
Peak luminosity .00 x 10 34 cm-2s-1
Integrated luminosity (shift) .0 pb-1 .0 pb-1

LER HERBoth DR
Energy 4.002 GeV 7.010 GeV 10.583 GeV 1.1 GeV
Beam current 700.6 mA 100.3 mA 26.6 mA
No. bunches 2346 2346
Beta at IP 80 mm / 1 mm
384.0 mm / 48.6 mm
60 mm / 1 mm
Crab Waist Ratio 0 % 0 %
Aborts 3 30 0

IP Knob Tuning

15:59 LER HER
r1 (mrad) 0.00 0.00
r2 (mm) 0.00 0.00
r3 (1/hm) 0.00 0.00
r4 (crad) 0.00 0.00
ηy (mm) 0.00 0.00
ηpy (mrad) 0.00 0.00
waist (mm) 1.65 -1.70
chromatic r1 (mrad) 0.00 0.00
chromatic r2 (mm) 0.00 0.00
chromatic r3 (1/m) 0.00 0.00
chromatic r4 (rad) 0.00 0.00
created on 11/07/2024 16:01:08