| Paper | Title | Page |
|---|---|---|
| TUPS028 | Upgrade of the Positron Source for SuperKEKB | 906 |
| SuperKEKBに向けたKEKB入射ライナックの陽電子ビーム増強 |
| Paper | Title | Page |
|---|---|---|
| TUPS033 | Present Status of the KEK Electron/Positron Injector Linac | 926 |
| KEK電子陽電子入射器の現状 |
| Paper | Title | Page |
|---|---|---|
| TUPS151 | Recovery Efforts of RF Sources at KEK Electron-positron Linac due to East Japan Large Earthquake | 1339 |
| 東日本大震災からのKEK 電子陽電子入射器高周波源の復旧作業 |
| Paper | Title | Page |
|---|---|---|
| TUPS152 | Study of Spark Gap Switch for Crowbar Circuit | 1344 |
| クローバ回路用スパークギャップスイッチの検討と試験 |
| Paper | Title | Page |
|---|---|---|
| TUPS153 | RF Sources of S1 Global Project in Super-conducting RF Test Facility (STF) at KEK | 1347 |
| KEK超伝導RF試験施設(STF)におけるS1 Global計画でのRF源 |