SuperKEKB Design Report
-
Physics Motivation (Jun.23.2014)
-
Overview (Sep.13.2019)
-
Beam Dynamics (Sep.05.2019)
-
Lattice Design (Oct.19.2020)
-
IR Design (Oct.19.2020)
-
RF System (Oct.21.2020)
-
Magnet System (Oct.20.2020)
-
Vacuum System (Oct.20.2020)
-
Beam Instrumentation (Oct.20.2020)
-
Beam Transport (Oct.20.2020)
-
Injector Linac (Oct.23.2020)
-
Damping Ring (Oct.20.2020)
-
Accelerator Control System (Oct.20.2020)
-
Safety System (Oct.20.2020)
-
- These files are latest as of Oct.2026.
Y. Funakoshi, K. Furukawa, SuperKEKB Commissioning Group, KEK
Kazuro Furukawa <webmaster@mail-linac.kek.jp> ,
Oct.28.2020 - Oct.08.2026.
[SuperKEKB]
[Linac]
[Linac-Com]
[Accelerator]
[Belle2]
[KEK]