Updated on October 1

Schedule

October 9 (We): MR Operation Start

2024c Schedule

Maintenance

Dates Remarks
October 30 regular
November 27 regular

Past Operation History

Records

Parameter LER HER Unit
Beam Current 1321 1099 mA
Number of Bunches 2249
Bunch Current 0.587 0.489 mA
Beam-Beam Parameter ξy 0.0407 0.0279
Σy* 0.303 μm
σy* 0.215 μm
Tunes (x/y) 44.525 / 46.589 45.532 / 43.573
Specific Luminosity (x1031) 7.21 cm-2s-1/mA2
Luminosity (x1034) 4.65 cm-2s-1
Parameter LER HER Unit
Beam Current 1363 1118 mA
Number of Bunches 2249
Bunch Current 0.606 0.497 mA
Beam-Beam Parameter ξy 0.0398 0.0278
Σy* 0.315 μm
σy* 0.223 μm
Tunes (x/y) 44.524 / 46.594 45.532 / 43.574
Specific Luminosity (x1031) 6.95 cm-2s-1/mA2
Luminosity (x1034) 4.71 cm-2s-1
Integrated Luminosity Recorded Date Delivered Date
Shift (pb-1) 958.1 April 24, Swing, 2022 1035.9 April 22, Swing, 2022
1 days (fb-1) 2.503 April 22, 2022 2.912 June 11, 2022
7 days (fb-1) 15.001 April 18 - April 24, 2022 16.599 April 18 - April 24, 2022