| Date |
Reporter |
Title |
Files |
| 2009/12/04 |
T.Higo |
KEK status |
 |
| G.Riddone |
CERN production |
 |
| A.Olyunin |
Broad X-band high power load H-02 for SLAC Final RF test results |
 |
| 2009/11/27 |
S.Atieh G.Riddone |
Machining process for disk damped cells Actions |
 |
T.Takatomi T.Higo |
Machining process for disk damped cell taking the example of TD18 #2,#3 |
 |
| 2009/11/26 |
F.Wang |
T24 High Power Test Result |
 |
| G.Riddone |
T24 structure fabrication |
 |
A.Toerklep G.Arnau Izquieldo |
T24-11WNSDvg1.8Cu Post mortem SEM inspection |
 |
| 2009/09/25 |
T.Higo |
KEK status |
 |
| G.Riddone |
CLIC structure collaboration WebEx meeting CERN production |
 |
| 2009/08/28 |
T.Higo |
KEK status |
 |
| G.Riddone |
CLIC structure collaboration WebEx meeting CERN production |
 |
| T24 structure fabrication |
 |
| 2009/06/26 |
T.Higo |
KEK status |
 |
| G.Riddone |
CLIC RF structure production |
 |
| J.Wang |
Report from SLAC |
 |
M.Gerbaux R.Zennaro A.Olyunin |
A history of the RF measurement performed on the T24_vg18_disk structure |
 |
| 2009/05/29 |
T.Higo and K.Ueno |
KEK status |
 |
| 2009/04/24 |
T.Higo and Nextef group |
T18_VG24_Disk_#2 processing(11) |
 |
| K.Ueno |
X band structure manufacturing status at KEK |
 |
| J.Wang |
Report from SLAC |
 |
|   |
Dark Current Spectrum |
 |
| 2009/03/27 |
K.Ueno |
X band structure manufacturing status at KEK |
 |
| G.Riddone |
EDMS Number & Id |
 |
| G.Riddone |
Structure Master Schedule and CERN production status |
 |
| J.Wang |
Report from SLAC |
 |
| 2009/02/27 |
G.Riddone |
Structure Master Schedule and CERN production status |
 |
| S.Matsumoto |
Nextef status |
 |
| Ueno |
On X band structure manufacturing status at KEK |
 |
| J.Wang |
Report from SLAC |
 |
T.Higo K.Yokoyama J.Zhang T.Takatomi Y.Watanabe |
TD18_VG24_Quad_#5(1) S-parameter as of machined |
 |
|   |
X-band Structure Master Schedule |
 |
| X-band Structure Master Schedule |
 |
| 2009/01/29 |
T.Higo |
KEK status |
 |
| S.Matsumoto |
Nextef status and plan |
 |