5-8 October 2021
Virtual Event
Europe/Madrid timezone

ALBA synchrotron operation during Covid-19 pandemic

6 Oct 2021, 15:15
25m
Zoom application, link on the 'Links' tab of the main menu

Zoom application, link on the 'Links' tab of the main menu

Oral presentation Track II: Running a Beam Particle Accelerator during the COVID-19 pandemic Running a Beam Particle Accelerator during the COVID-19 pandemic (I)

Speaker

Ferran Fernández

Description

ALBA is a third generation 3GeV synchrotron light source near Barcelona (Spain). In operation for users since 2012, there are 8 beamlines in operation, 2 in commissioning and 3 under construction. On March 2021 the Covid-19 pandemic forced Spain to a strict confinement, stopping abruptly the operation of the facility. One month after, we resumed operation with a “light” operation mode; dedicated initially to Covid-19 related experiments. Another month later, we were open again for users with almost the usual operation schedule. Due to the travelling difficulties most of the samples used the mail-in system. In this talk, we will discuss about the adopted measures to protect the operators in the control room along the pandemic, including the setting up of a secondary control room just “in case of”, and the solutions implemented to reduce the impact of operating with a reduced staff on site, or how accelerator physics studies have been conducted via teleconferences.

Session Session II: Running a Beam Particle Accelerator during the COVID-19 pandemic.

Primary authors

Presentation Materials